Followers

Monday, August 19, 2013

July and August at Northbridge Golf Club

Recent prolonged wet weather has had a major effect on maintenance programs and what we have been capable of accomplishing. We have had over 400mm since the 6th of May, which is more than enough to fill the dam from empty, which it well and truly is not.

Luckily, the last month has seen some dry conditions come our way, meaning we can get all the mowers back out on the course and begin with our next projects.



We have been concentrating on drainage project, particularly an area between the 13th green and 14th tee, at the top of the new granite path. We cut quite a deep drain and connected it to existing drainage to solve issues that have left the area soaked in the past. We have seen good results so far.

While doing the drainage trenching, we reshaped around the 13th green to make it mower and play friendly, meaning that we can accomplish a better quality surrounds.



When we completed that drain, we cut a series of fairway and rough drains on 2nd. We constructed an extensive network of drains to fix up a prolific wet area formed by runoff and seepage from the bushland banks above the second green and 3rd back tee




As per standard construction, the drains are constructed by digging a trench with a trenching machine with a fall of 1m per 100m. The trencher then has to be followed along and all the soil taken away. This is possibly the most labour intensive part of the project, since this has to be done by hand. We then place 50mm of fine gravel in the base of the trench, followed by ag-pipe, and then the pipe is surrounded and covered by gravel to another 50mm of depth. The rest of the trench is then filled completely with sand.


This creates a path of least resistance for the water to follow and promotes the water following the pipe, instead of travelling through the thicker and heavier soil around itself.

We have been continuing the path program, repairing and replacing some older damaged paths. We have been trailing different rates of granite, concrete and bonding agents to try and accomplish the best quality possible. Granite alone wears down over time and pure concrete is too expensive to be practical. We have set up some trial sites to test different rates, combinations and thicknesses to find the most resilient and cost effective combination. We will continue to monitor the results over the next 12 months and then when we are satisfied with the long term results, we will resurface existing paths to create a superior finish.






The bushland regeneration project for the left side of 10th fairway has been approved by council, meaning that we shall start work in the next month or two, depending on the availability of crushed sandstone that we can bring into the area, since we will need a lot for the project of the size we wish to accomplish. This project will completely eradicate the weeds in the area and create another pocket of native vegetation in the area, which not only provides a beautiful setting for our course, but allows native wildlife, such as birds and lizards, to begin repopulating the area.





Tuesday, June 18, 2013

Winter is coming. May/June 2013


This time of year the weather has a big impact on course maintenance programs. Periods of heavy rain can leave the course saturated for extended periods of time, restricting the equipment we are able to put on the turf. This significantly effects work scheduling.
With the coming of winter, we can expect more bad weather. We still have plenty of work to do in the rain. It makes a perfect time to catch up on housekeeping, gardening and paperwork jobs, which the summer workload does not allow sufficient time for.

Over the last month, we have been continuing with the path program, constructing new granite pathways and turfing to blend them into the surrounding turf.
We have decided to put a row of Couch along the paths, since Kikuyu has a tendency to quickly overgrow paths, leading to higher maintenance requirements. Couch is also more wear resistant, allowing for the high traffic the edges of the paths receive.

The most recent path to be completed was the 2nd hole. As well as removing the old mulch path, opening up more playable turf below the ladies plates on the 3rd, creating a firm base and loosening compacted soil around the path, we created a diversion hump below the back tee at the 3rd to force the run-off water from the 3rd tees to flow through the gardens into the dam instead of on to the 2nd fairway.





The existing granite path around the 7th green has been extended to the front of the green, creating a much smoother route up to the 8th tee. We also repaired a number of worn patches in the rough left of the green.




The path on the left of the 8th green extends from the left bunker to the 9th tee. This took a bit extra time since we had to remove quite a bit of sandstone which was just beneath the surface. The removal of this sandstone will allow the new turf to thrive with a deeper soil profile. 


The 14th path is the longest of the granite paths, going from just below the 14th tee, all the way to the fairway along the tree line of the 18th.


These new paths are making huge difference to the course. Not only do they improve the aesthetics of the course, creating a better looking and smoother journey around the course, it also greatly aids in the reduction of wear on the turf and the golf carts.

Tuesday, April 23, 2013

April 2013

Summer is thankfully on its way out, meaning that we can start dedicating more time to course improvement projects that are practically impossible during the rush of summer.


One such project is the path program.


So far we have prepared and installed granite paths at the 6th (extending path below green), 7th (Extending path from tee’s to fairway and reshaping of surrounding rough), 15th (Path from tee to trees below green) and the 18th (significantly extended path below tee). We are pleased with the outcome and are now preparing the next phase




The second phase will be below the 7th green, above the bunker at the 8th green, down the treeline between the 14th and 18th holes and the final connection at the 15th green joining the granite to the concrete.

Weather permitting; the contractors are booked in to start work on the remaining granite paths on Monday, April 29th.



During April we have oversown our shaded tee’s with ryegrass to improve the grass coverage during winter. The tees done are the middle and front tees at 5, all the tees at 6, 8th, 9th, both tees at 10 and both tees at 14.

While doing this we have oversown 6th, 7th and 8th fairways, which also suffer from shade problems during winter. This was combined with a good application of fungicide on all the fairways to prevent diseases such as Winter Fuserium.


The championship tee at 11 has been completely re-levelled and returfed providing a smooth, true surface for play. It is currently growing in well and is much improved on its old condition. This will be open for play approximately in the middle of May.



 

The path at the 11th green has been widened to allow better two way traffic flow and new turf has been laid alongside it.

We are beginning the construction of a new, extended nursery at the 17th for greens quality turf to go along with our fairway/tee nursery. This will be used to replace damaged sections of greens from vandalism and the effects of winter, meaning less downtime and better quality greens.

We plan to begin the removal of Nutgrass, kikuyu and blue couch from the greens, providing a smoother, higher quality putting surface.

It is our aim to provide our members and visitors with the best possible playing surface and a memorable day of golfing and we believe that these projects will help us towards this goal.

-Course maintenance team

Monday, December 12, 2011

New turf coming into summer

It has been 12 months since we received the soil from Northbridge oval and the soil levy work started. Combined with the fairway irrigation and water availability from the dam, we have been able to push Northbridge GC in the direction that we all know it should go.

The 12th fairway is a perfect example of this. It is amazing how much the new works have improved the fairway. The rough beneath the 13th tee’s used to be a thin, bare area where no grass would grow, but now we have thick kikuyu growing strongly. What would have used to be considered a bad lie for a ball is now perfectly playable. It also makes the hole play longer as balls hitting the rough are stopped quickly by the thick grass. It now requires a more accurate shot on the fairway.

Still on the 12th fairway, the removal of the temporary green has added a smoother area of turf cut at fairway height meaning that less balls will roll down the bank into the rough, or if unlucky, into the gully.

While possibly the most evidently different, we cannot forget about other works that have occurred around the course. At the 7th, bare patches on the left of the fairway and below the 8th tee banks have been fixed and are now well growing rough.


The removal of the ridge in front of the 9th tee has also made an impressive difference, removing the rocky, dirt covered mounds and not only providing a better playing surface, but also allowing a view down the fairway from the tee.



Work has been completed on the right side of the 8th fairway, green end of the 9th, reshaping around the dam on the 13th fairway and 11th green and small patches throughout all the fairways having almost seamlessly blended in now

Earlier this month, we completed shaping and turfing the area on the left of the 14th fairway, just below the 18th green and the path down from the 18th tee to fairway. On top of being aesthetically better, the new turf on the path will provide a much smoother ride on the golf carts. With the completion of these two sites, we have moved almost 3,500 cubic meters (roughly 5000 tonnes) of soil over the last 12 months.

There is no doubt, the soil from Northbridge Oval has been a blessing and the Soil levy projects a great success. We continue to see the course improving, making it a better place for members and social golfers to visit.

On behalf of myself, Brendan, Lance, and all the greens we would like to wish all members a great Christmas and New Year.

Malcolm Harris.

Monday, May 23, 2011

Soil Levy Works.

Completed 12th hole.



12 hole before work.






9th before work to reshape and repair.








Receiving the 3,000 cubic meters of soil from the recent Northbridge oval upgrade has been fantastic. Since December we have been super busy transporting the soil, spreading, shaping and turfing it.





9th after remodeling work.



The area of fairway at the front of the 12th fairway was a particularly difficult site to fix up, having to deal with the redirection of large amounts of overland runoff and a maze of water holding rock shelves. This job alone would have cost $55,ooo with approx $40,000 being for soil.I am quite pleased with the results.









Allan doing some lovely turfing.



The other areas that have been repaired / returfed are the right side of the 1st fairway, the left and right roughs of the 7th hole, the right side of the 8th rough, the left and right sides of the 9th as well as the big area (1800m2) in front of the 9th tee.







We are finishing off all work returfing areas on the 12th hole, right and left sides of the rough before moving to the left of the 14th fairway.





























Tuesday, November 30, 2010

Turfing patches in Fairways.




The practice of oversowing fairways with rye grass had until 5 years ago been a regular maintenance procedure at Northbridge. We were doing this for about 10 years. It looked great from May through September however it became increasingly difficult to transition the rye in the Kikuyu in spring / early summer. The decision was made to discontinue this practice.
A legacy of this oversowing has been many patches appeared in fairways and roughs of thin, weak Kikuyu with clumps of rye grass scattered in the bare patch. After chemically removing the rye, these patches persisted. The Kikuyu was very weak, riddled with fungal disease (Helmo) and exhibiting symptoms of mite damage. After re turfing many of these patches the new turf struggled to stay healthy, showing the same symptoms as the turf it replaced. Even after digging out the soil to a 300mm depth and replacing with new soil the Kikuyu turf was still struggling. This was making us look stupid, indeed it was a perplexing problem. After several attempts of re turfing with Kikuyu, I tried using Santa Anna couch. This worked perfectly with the couch having no problems at all.
One of the consultants who visits most of the golf courses in Sydney sees this interaction between ryegrass and Kikuyu in random patches regularly. There is sufficient anecdotal evidence to suggest there is an allelopathic effect from rye grass toxins effecting the Kikuyu. My assistant Brendan Brown who is currently doing his Masters degree at Sydney Uni suggested to Dr Peter Martin that he could do his research project on identifying the cause of this problem. Dr Martin felt this was more of a PhD project in respect to the amount of work required.
Anyway, I know some of the members have questioned why a grass other than Kikuyu is being used in the fairways. I hope this helps to answer the question.








Monday, November 8, 2010

Greens rennovations November 8th










Today we airated the greens with our vertidrain machine. We used 10mm hollow tines at 25mm spacings. A composted organic amendment and calcium amendment were applied followed by sand topdressing.